deutschenglisch

Entire Installations - Beer

  • Brewery Rhaner
  • Brewery Bolten
  • Brewery Ketterer

Rhaner Brewery

  • Capcity 12.000 bottles/h
  • Entire installation planned by Füllmeister
  • Reconstruction of the older parts of the installation
  • in the new bottling center incl. logistics center
  • Palettizer, unpacker, packer
  • Bin and barrel transport
  • Clamp upward-conveyer
Rhaner Video

Brewery Bolten, Korschenbroich

  • Capcity 12.000 bottles/h
  • Entire installation planned by Füllmeister
  • 0.5 ltr NRW
  • 0.5 ltr clip-lock bottles         
  • Integration Krones, Heuft and Gernep machines 
  • Packer, unpacker, palettizer
  • Transport of boxes and bottles
Bolten Video

Brewery Ketterer, Hornberg

  • Capacity 12.0000 bottlesl/h
  • Entire installation planning by Füllmeister
  • including supply and disposal connections
  • Multi-functional installation for beer and non-alcholic beverages up to live mineral water
  • 5 different kinds of bottles
Ketterer Video